After days of disruption in Himachal Pradesh, the region is now steadily moving toward restoration, bringing back normalcy and hope. The recent disaster that impacted lives and infrastructure—especially in Manali, Kullu, and Mandi—had saddened the entire nation. Today, progress is visible, and travel to Manali for the Hampta Pass Trek has become smoother.
Road Travel Update
– Delhi–Chandigarh–Manali Highway: Nearly 80% of the route has been restored. Volvo and state transport buses are operating conveniently up to Mandi.– From Mandi, multiple shared taxis are readily available to reach Manali without hassle.– With continuous efforts by NHAI and BRO, full connectivity is expected to be restored by 14 September 2025.– Manali–Leh Highway via Atal Tunnel: Reopened today for light vehicles after 10 days, bringing much-needed relief to residents and tribal farmers of the Lahaul region in Lahaul and Spiti district.
To verify road conditions, Trekup India sent Trek Leader Mr. Bharath from Dehradun to Manali via Chandigarh in a Volvo bus. He reported smooth travel up to Mandi and a comfortable onward journey to Manali in a shared taxi, reaching on schedule.
Check out the video below, shared by our Trek Leader Bharat straight from Ground Zero at Manali Base Camp, covering Hampta Pass Trek, Chandrabhaga Glaciers Trek, Bhrigu Lake, Beas Kund Trek, Kanamo Peak, and Friendship Peak Expedition.
Weather & Monsoon Declined
The monsoon season is in its declining phase, with a consistent reduction in rainfall. Weather reports indicate stable conditions, making the Hampta Pass Trek safe and feasible in the coming weeks.
Trekup India Campsite & Ground Report
Our Manali team recently completed an inspection of all Trekup India campsites and equipment. No damage has been reported—our equipment completely remains safe and ready. A visit to Chandratal Lake via the Atal Tunnel confirmed that the road is open and accessible.
Upcoming Guaranteed Departures
Trekkers who had earlier postponed or cancelled their Hampta Pass Trek and opted for vouchers are welcome to re-join. All upcoming batches are confirmed and operational:
14 September 2025 – Operational – Confirmed
18 September 2025 – Operational – Confirmed
20 September 2025 – Operational – Confirmed
22 September 2025 – Operational – Confirmed
24 September 2025 – Operational – Confirmed
28 September 2025 – Operational – Confirmed
29 September 2025 – Operational – Confirmed
30 September 2025 – Operational – Confirmed
01 October 2025 – Operational – Confirmed
04 October 2025 – Operational – Confirmed
Welcome back to Hampta Pass Trek.



